Frequently asked questions

Quick answers to the questions City Hall hears most.

75 of 163 questions

Permits, building and zoning

Are City inspections required?

Yes, in most cases before the Development Services Department’s Building Services Division issues a Certificate of Occupancy (C.O.), the Planning and Zoning Division shall complete an inspection for a Certificate of Acceptance (C.A.)

Upon completion of the development, the developer shall provide a "notice of development completion" to the Director of Development Services. The developer shall also provide the City with an as-built survey in a format specified by the Planning and Zoning Division and other certifications as required by City departments. The Director or the Director's designated representative shall, within five (5) working days after receipt of such notice and required related documentation, conduct a final site inspection to ensure that the development was constructed in accordance with the approved development order or development agreement. The Director shall, within five (5) working days following a final site inspection, either accept or reject the completed development. Upon acceptance, the Director shall certify that the completed development is in compliance with the approved development order or development agreement and shall authorize the building official to issue a certificate of occupancy.

If the completed development is rejected, the Director shall provide written notice to the developer and the building official describing the basis or circumstances upon which the development was rejected. No certificate of occupancy shall be issued, nor shall the utilities or electric service be connected, nor acceptance of dedicated streets or easements be authorized, until a certification of acceptance is issued by the Director.

Link to this answer: Are City inspections required?

Are gravel parking lots allowed within the City limits?

No. Parking areas must comply with the City’s Parking and Loading standards which can be viewed here: Chapter 108 - PARKING AND LOADING. Paved or approved paving systems are required to address drainage, durability, and accessibility. Gravel parking is not an approved paving system.

Link to this answer: Are gravel parking lots allowed within the City limits?

Can a mobile home be used as an accessory dwelling unit?

No. Mobile homes cannot be used as an accessory dwelling unit.

Link to this answer: Can a mobile home be used as an accessory dwelling unit?

Can I live in a Connex box or storage container?

No. Storage containers, including Connex boxes, are not dwelling units and do not meet zoning or building code requirements for residential occupancy.

Link to this answer: Can I live in a Connex box or storage container?

Can I operate a business from my home?

Certain home-based businesses may be allowed as a home occupation, depending on zoning regulations and performance standards. Restrictions are focused on ensuring the residential character of the property is maintained, prohibiting increase in traffic and limiting business activities to members of the family who reside in the home.

Link to this answer: Can I operate a business from my home?

Can I use a Connex box as storage in my back yard?

No. Accessory structures utilized as storage must comply with the accessory use requirements of the Unified Land Development Code (ULDC) provided here: Sec. 110-4. - Accessory structures.

Link to this answer: Can I use a Connex box as storage in my back yard?

Do I need a Development Order approval prior to my building permit being issued?

Yes. A Development Order is required before a building permit can be approved. City staff reviews projects to ensure they meet zoning and land development regulations prior to construction.

Link to this answer: Do I need a Development Order approval prior to my building permit being issued?

Do I need a Development Order to build an accessory structure?

Yes, most accessory structures (sheds, pools, accessory dwelling units etc.) require development order approval and must comply with zoning setbacks, height limits, and placement requirements. These structures usually require a building permit.

Link to this answer: Do I need a Development Order to build an accessory structure?

Do I need a Development Order?

A Development Order is required for most development activities that change how property is used or developed. This may include new construction, expansions, changes in use, increases in intensity, or redevelopment of a site. The Development Order confirms that a proposal complies with the City’s zoning, land development regulations, and the local Comprehensive Plan. Some activities may be exempt from a Development Order.

The most common example is the renovation, repair, alteration or maintenance to an existing single-family home, duplex, triplex, quadraplex, manufactured home or mobile home on one lot or parcel which does not require a building permit, increase the square footage of a structure, or change its use as a residential unit. Exemptions are limited and project-specific. Property owners should always confirm with the Development Servies Department’s Planning and Zoning Division staff before proceeding.

Link to this answer: Do I need a Development Order?

Do I need a permit for a fence?

No, Panama City does not require a permit for a fence. However, you may be required to obtain a Development Order. To determine if your proposed fence requires a Development Order, please email planning@panamacity.gov. For more information: Panama City, FL | Municode Library

Link to this answer: Do I need a permit for a fence?

Do I need a permit to do minor roof repair?

Minor repairs, such as replacing a few shingles or repairing small sections of fascia, do not require a permit.

If the repair is 100 square feet or more a permit is likely required.

In the event that you experience an emergency, such as a fallen tree limb damaging your roof, please make the necessary emergency repairs and apply for a building permit the following business day.

Link to this answer: Do I need a permit to do minor roof repair?

Do I need to hire a contractor or can I do the work myself? What does owner-builder mean?

You must qualify for owner-builder exemption. Pursuant to Florida Statute 489.103(7) an owner/occupant of a property may be issued a permit to do contracting work on their own property. An affidavit must be signed establishing the owner-builder exemption. This affidavit must be signed in person in the Development Services office located at 501 Harrison Ave Panama City, FL Room 217. An owner-builder may only hire licensed subcontractors in those trades that carry a contractor's license.

"Owners of property when acting as their own contractor and providing direct, onsite supervision themselves of all work not performed by licensed contractors, when building or improving farm outbuildings or one-or-two family residences on such property for the occupancy or use of such owners and not offered for sale or lease, or building or improving commercial buildings, at a cost not to exceed $75,000, on such property for the occupancy or use of such owners and not for sale or lease." Florida Statutes, ss:489.103.

Link to this answer: Do I need to hire a contractor or can I do the work myself? What does owner-builder mean?

Does someone need to be at the job site for the inspection?

Any occupied home or business must have a representative onsite that is 18 years of age or older and able to provide access to all areas requiring inspection. Inspections for permitted work on unoccupied projects do not require a representative onsite but access must be available to all areas requiring inspection.

Link to this answer: Does someone need to be at the job site for the inspection?

Does the City issue Development Orders for fences located on single-family lots?

No, the Development Services Department does not issue development order fences on individual single-family lots. Property owners will need to have their property surveyed, prior to the fence being installed to ensure it does not encroach into the City’s Right of Way or on to an adjacent property.

Link to this answer: Does the City issue Development Orders for fences located on single-family lots?

How can I find a licensed contractor?

Link to this answer: How can I find a licensed contractor?

How can I make a complaint without giving my personal information?

Unfortunately, Florida Statute 162 does not allow for anonymous complaints. In order to investigate your tip, I would need your name and address. This information will become public record if a case is initiated as a result of the complaint.

Link to this answer: How can I make a complaint without giving my personal information?

How can I make a public records request?

Contact the City Clerk at publicrecords@panamacity.gov

Link to this answer: How can I make a public records request?

How do I apply for the required permit?

You can apply through cloudpermit.com or by coming to the Building Services Division at City Hall and apply in person. We have a public kiosk available in our office along with staff that can help answer questions as you complete the application process.

Link to this answer: How do I apply for the required permit?

How do I close my permit once the work is done?

Ensure all inspections have been scheduled and have received a score of “PASSED”. To close your permit, you will submit for the REQUEST FOR CERTIFICATE OF COMPLETION/OCCUPANCY INSPECTION

Link to this answer: How do I close my permit once the work is done?

How do I extend the expiration date on my permit?

If you will not be ready for inspection before your permit expires, you can request an extension of your permit by submitting an extension request with our office.

Link to this answer: How do I extend the expiration date on my permit?

How do I find out what my property is zoned?

You can determine your property’s zoning designation by using the City of Panama City’s online GIS map View the Future Land Use and Zoning Map. You can also contact the Development Services Department’s Planning and Zoning Division directly. You will need the property address or parcel number for accurate results.

Link to this answer: How do I find out what my property is zoned?

How do I know if I can split my lot?

Lot splits are subject to zoning regulations, minimum lot size requirements, access, and subdivision standards. Contact the Planning and Zoning Division to review your parcel’s zoning and determine whether it qualifies for subdivision approval.

Link to this answer: How do I know if I can split my lot?

How do I pay for my building permit?

Once all applicable departments have reviewed your permit application, an invoice will be emailed to you. You may pay this invoice online by following the link provided in that email or you may pay by check or exact cash by bringing your payment to City Hall, Room 217

Link to this answer: How do I pay for my building permit?

How do I register a complaint about what appears to be a building code violation or a complaint about a contractor?

If you feel your contractor has committed fraud, misconduct, negligence, or has abandoned their contracted duties, you may wish to file a complaint against their license. You will need to contact the Florida Department of Business and Professional Regulation (DBPR). You can file a complaint online or contact the local office at (850) 487-1395.

Link to this answer: How do I register a complaint about what appears to be a building code violation or a complaint about a contractor?

How do I request a variance or rezoning?

Requests for variances or rezonings must be submitted through a formal application process. The Planning Board makes the final decision on variances. Rezonings are heard before the Planning Board, and a recommendation of approval or denial is transmitted to the City Commission. The Commission makes the final decision on rezonings. Public notice and hearings are required. If you believe a variance or rezoning is appropriate for your property, contact the Development Services Department’s Planning and Zoning Division for guidance.

Link to this answer: How do I request a variance or rezoning?

How do I schedule inspections for my permit?

All inspections are scheduled in Cloudpermit. The cut-off time to request next business day inspections is 2pm CST

Link to this answer: How do I schedule inspections for my permit?

How do I verify my property is in City of Panama City?

qPublic - Bay County, FL - Search

Enter the property address. Under “Summary”, look for Tax Area. City of Panama City includes tax areas 16 and 31.

Link to this answer: How do I verify my property is in City of Panama City?

How long do I have to comply?

Florida statute 162 requires "reasonable time" be given to correct the violation. However, city policy is 30 days. More or less time may be offered if the violation warrants it.

Link to this answer: How long do I have to comply?

How long is a Development Order (D.O.) valid?

At the present time, the Development Order (D.O.) is valid for a period of twelve (12) months from the date it is issued by the City.

Link to this answer: How long is a Development Order (D.O.) valid?

How long is a Development Order valid?

At the present time, commercial, industrial, residential and accessory use Development Orders (D.O.) are valid for a period of twelve (12) months from the date it is issued by the City. Sign Development Orders (wall mounted and free-standing) are valid from six (6) months from the date of issuance by the City.

Link to this answer: How long is a Development Order valid?

How long is my permit valid?

All permits are valid for 180 days after it has been issued.

Link to this answer: How long is my permit valid?

How long is the Development Order review process?

Staff is allowed a 30-day review period after receiving the D.O. application and all the necessary documents for commercial and residential projects. The 30-days applies to both initial and re-submittals. Please note: the Department’s goal is to expedite the process, so we strive to complete this process a lot sooner.

Link to this answer: How long is the Development Order review process?

How long is the review process?

Staff is allowed a 30-day review period after receiving the D.O. application and all the necessary documents for commercial and residential projects. Please note: the Department’s goal is to expedite the process, so we strive to complete this process a lot sooner.

Link to this answer: How long is the review process?

How much does a permit cost?

This depends on the scope of work. The cost of a permit is not designed to generate a profit for the city at the expense of the resident.

Link to this answer: How much does a permit cost?

How much does a permit cost?

Link to this answer: How much does a permit cost?

I'm a property owner. Can I apply for a building permit, if I am not a licensed contractor?

Yes, pursuant to Florida Statute 489.103(7) an owner/occupant of a property may be issued a permit to do contracting work on their own property. An affidavit must be signed establishing the owner-builder exemption. An owner/builder may only hire licensed subcontractors in those trades that carry a contractor's license.

Link to this answer: I'm a property owner. Can I apply for a building permit, if I am not a licensed contractor?

Is a City inspection required?

Yes, in most cases. before Building Services issues a Certificate of Occupancy (C.O.), the Planning and Zoning Division shall complete an inspection for a Certificate of Acceptance (C.A.)

Upon completion of the development, the developer shall provide a "notice of development completion" to the Director of Development Services. The developer shall also provide the City with an as-built survey in a format specified by the Planning Division and other certifications as required by City departments. The Director or the Director's designated representative shall, within five (5) working days after receipt of such notice and required related documentation, conduct a final site inspection to ensure that the development was constructed in accordance with the approved development order or development agreement. The Director shall, within five (5) working days following a final site inspection, either accept or reject the completed development. Upon acceptance, the Director shall certify that the completed development is in compliance with the approved development order or development agreement and shall authorize the building official to issue a certificate of occupancy.

If the completed development is rejected, the Director shall provide written notice to the developer and the building official describing the basis or circumstances upon which the development was rejected. No certificate of occupancy shall be issued, nor shall the utilities or electric service be connected, nor acceptance of dedicated streets or easements be authorized, until a certification of acceptance is issued by the Director.

Link to this answer: Is a City inspection required?

Is a Development Order required for food trucks?

Yes, if it will be permanent or stationary. A Development Order will be required to confirm that the use, location, site layout, zoning and operational standards comply with City regulations. Additional permits or approvals may also be required. Mobile, non-stationary food trucks do not require a development order but will require inspections and approvals from the City’s Public Works and Fire Departments.

Link to this answer: Is a Development Order required for food trucks?

My home was damaged by a natural disaster. Now what?
  • Visit Home | disasterassistance.gov for information on assistance that may be available
  • Permits may be required for any repair or demolition work that needs to be completed. A process will be put into place to assist property owners with expedited permits to complete work necessary
  • As soon as it is safe to do so, teams of building and property inspectors will be dispatched to assess damage and prioritize structures and properties affected
  • Please visit DBPR Hurricane Guide – MyFloridaLicense.com for additional resources

Link to this answer: My home was damaged by a natural disaster. Now what?

What can I build on my property?

What you can build depends on your property’s zoning district and applicable land development regulations. Zoning provides bulk regulations for permitted uses, building height, density, intensity, setbacks, impervious surface area and other development standards. Zoning Districts regulations are provided within the City of Panama City Unified Land Development Code and can be viewed here: Chapter 104 - ZONING DISTRICTS.

Link to this answer: What can I build on my property?

What does the inspector need to inspect?
  • Access. Generally, our inspectors have the ability to access a single-story roof. The contractor is responsible to provide access to any location requiring inspection.
  • A complete set of legible permit documents as approved through plan review must be onsite in a weatherproof container for each inspection.

Link to this answer: What does the inspector need to inspect?

What happens after my D.O. is issued?

When the D.O. is issued, you will receive an approved development order. If your activity requires a building permit, the approved D.O. will need to be submitted with your building permit application using the online portal called Cloudpermit. The Building Services Division will issue a building permit once all Florida Building Code and local requirements have been met. If your activity does not require a building permit, you may commence the activity in accordance with the approved site plan.

Link to this answer: What happens after my D.O. is issued?

What happens after my Development Order is issued?

Once an approved Development Order is issued, you will then be eligible for building permit review. Building permits will need to be applied for electronically via the Development Services Department's online portal. The Building Services Division will issue a building permit once all Florida Building Code and local requirements have been met. If your activity does not require a building permit, you may commence the activity in accordance with the approved site plan.

Link to this answer: What happens after my Development Order is issued?

What if my request cannot be approved at Staff Level?

Certain types of requests may need Planning Board and/or City Commission approval before Staff can review. Applications must be submitted electronically on Cloudpermit. Staff will assist the applicant with submitting applications on the portal and provide information regarding application fees, meeting submission deadlines, as well as meeting dates and times. Planning Board application fees are paid at the time the application is submitted. In most cases, these are non-refundable.

Link to this answer: What if my request cannot be approved at Staff Level?

What is a “change of use” and what triggers a change of use? Can there be a change of use even if no physical development is proposed?

A change of use occurs when a property or building is proposed to be used for a different purpose than it was previously approved or legally established for. A change of use may be triggered when the new use requires that the building and the site function differently than what was previously approved, resulting in increased parking demand, traffic, noise, or other operational impacts. A change of use often requires zoning review and may require a Development Order.

A change of use can occur even when no construction, expansion, or site improvements are proposed. A change of use is based on how a property or building is used, not solely on whether physical development takes place.

For example, changing a space from retail to office use, may constitute a change of use even if the building remains unchanged. In these cases, City review or inspections may still be required to ensure the proposed use complies with City codes. Property owners are encouraged to contact the Development Services Department’s Planning and Zoning Division before changing a use to determine whether a Development Order or any other approvals are required.

Link to this answer: What is a “change of use” and what triggers a change of use? Can there be a change of use even if no physical development is proposed?

What is a Certificate of Acceptance (CA) and why would my development one?

A Certificate of Acceptance is issued by the City to confirm that the final development along with any infrastructure such as streets, sidewalks, stormwater systems, or utilities have been constructed in accordance with approved plans and Unified Land Development Code standards. This certificate is often required before the City accepts maintenance responsibility for those improvements and before final project approvals are completed. A Certificate of Acceptance is required prior to the issuance of a Certificate of Occupancy (CO).

Link to this answer: What is a Certificate of Acceptance (CA) and why would my development one?

What is a Development Order (D.O.)?

A Development Order (D.O.) is what the City issues once your plans or requests for development have been approved by the City. The D.O. Application must be submitted electronically via the Development Services Department's online portal.

Link to this answer: What is a Development Order (D.O.)?

What is a setback and how does it affect my project?

A setback is the minimum required distance between a structure and property lines, streets or right-of-way. Setback requirements vary by zoning district and use. They help ensure safety, privacy, and proper development spacing.

Link to this answer: What is a setback and how does it affect my project?

What is a signed and sealed as-built survey and why would I need one?

A signed and sealed as built survey documents the actual location of improvements after construction. As built surveys are used to confirm that a development was constructed in accordance with approved plans in the Development Order. As built surveys are required prior to issuance of a Certificate of Acceptance.

Link to this answer: What is a signed and sealed as-built survey and why would I need one?

What is a signed and sealed survey and why would I need one?

A signed and sealed survey is prepared by a Florida-licensed surveyor and mapper. Under the ULDC, surveys are used to verify property boundaries, lot dimensions, easements, rights-of-way, and existing improvements. A signed and sealed survey is commonly required as part of a Development Order application or when zoning compliance, such as setbacks or lot area, must be verified.

Link to this answer: What is a signed and sealed survey and why would I need one?

What is a site plan?

A site plan is a scaled drawing submitted for zoning and development review showing proposed or existing development on a property. Site plans illustrate building placement, parking, access, landscaping, utilities, drainage, and setbacks. Site plans allow the City to evaluate compliance with zoning districts, development standards.

Link to this answer: What is a site plan?

What is FBC, and why does it matter?

The Florida Building Code (FBC) is the statewide set of rules that governs how buildings in Florida must be designed, constructed, and maintained. It’s important because it protects people, property, and communities, especially in a state with hurricanes, flooding, and unique environmental risks.

Link to this answer: What is FBC, and why does it matter?

What is my development request cannot be approved at the staff level?

Certain types of requests may need Planning Board and/or City Commission approval before Staff can review. Applications must be submitted electronically via the Development Services Department's online portal. Staff will assist the applicant with submitting applications on the portal and provide information regarding application fees, meeting submission deadlines, as well as meeting dates and times. Planning Board application fees are paid at the time the application is submitted. In most cases, these are non-refundable.

Link to this answer: What is my development request cannot be approved at the staff level?

What is required to register as a contractor with City of Panama City?
  • Documents required (non-Private Provider)
  • Proof of Workers Compensation or Exemption
  • Notarized Letter of Qualifiers Authorized Agent(s)
  • Occupational License or Business Tax Receipt
  • Documents required (Private Provider)
  • State license (DBPR)
  • State ID/Drivers License (contractor)
  • Certificate of Liability
  • Certificate Holder:
  • City of Panama City
  • 501 Harrison Ave
  • Panama City, FL 32401
  • Certificate Holder (does not apply to Exemption)
  • City of Panama City
  • 501 Harrison Ave
  • Panama City, FL 32401
  • Copy of the ID(s) are required for anyone being authorized
  • The notarized document cannot be notarized by anyone being authorized
  • Must be issued by a Florida-based municipality or jurisdiction
  • Sunbiz report may be used as a substitute
  • Private Provider-Duly Authorized Representatives
  • State License
  • Occupational License or Business Tax Receipt
  • Private Provider-Licenses Held
  • State ID/Drivers License
  • Certificate of Liability Insurance
  • Proof of Workers Compensation or Exemption
  • Private Provider-Registration Form

Link to this answer: What is required to register as a contractor with City of Panama City?

What is the difference between a Development Order and a building permit?

A Development Order is a planning approval issued by the City that confirms a proposed development or use complies with zoning and land development regulations. A building permit authorizes construction and confirms compliance with the Florida Building Code and life safety standards. A Development Order is often required before a building permit can be issued. Development Order and building permit applications must be submitted electronically via the Development Services Department's online portal.

Link to this answer: What is the difference between a Development Order and a building permit?

What is the difference between mobile, prefabricated and Residential Designed Manufactured homes?

The Unified Land Development Code distinguishes factory-built housing types based on construction standards:

  • Prefabricated home – Any home constructed in a factory setting including manufactured homes, modular homes and industrialized homes and complies with Florida Building Code standards.
  • Residential Designed Manufactured (RDMH) – A manufactured home installed on a permanent foundation and designed to be comparable in appearance and function to a site-built single-family dwelling. An RDMH must satisfy specific design and site requirements prior to the issuance of an approved Development Order. The RDMH Applicant’s Development Guide can accessed here: Residential Design Manufactured Home.
  • Mobile homes – An obsolete term used to describe a single-wide home or trailer, prefabricated in whole or part and not complying with the HUD Code or DCA requirements and without DCA insignia. A newer mobile home is allowed in a mobile home park as a replacement for an older mobile home, provided that it is not older than 15 years old.

All residential dwellings must comply with the single-family homes aesthetic or Residential Design Manufactured Home (RDMH) standards. Not all housing types are permitted in every zoning district, and placement is regulated by the Unified Land Development Code. Residential dwelling will need to be in compliance with the Florida Building Code.

Link to this answer: What is the difference between mobile, prefabricated and Residential Designed Manufactured homes?

What is the difference between the Unified Land Development Code (ULDC) and the Comprehensive Plan?

The Local Comprehensive Plan is the City’s long-range policy document that guides future growth and development. It establishes overall goals, objectives, and policies related to land use, housing, transportation, infrastructure, and conservation. The Comprehensive Plan looks ahead—typically 10 to 20 years—and describes what the City envisions for the future.

The Unified Land Development Code (ULDC) is the set of regulations that implements the Comprehensive Plan. It contains the specific, enforceable rules for development, such as zoning districts, permitted uses, setbacks, building heights, parking requirements, and design standards. In short, the Comprehensive Plan sets the vision, and the ULDC provides the rules to carry out that vision.

Link to this answer: What is the difference between the Unified Land Development Code (ULDC) and the Comprehensive Plan?

What is the Live Local Act and what does it allow?

The Live Local Act is a Florida state law intended to encourage the development of affordable housing. In general, it allows certain residential or mixed-use developments with affordable housing to be approved in areas that may otherwise be limited to commercial or non-residential uses, provided specific criteria are met. Projects must meet affordability requirements and comply with applicable state and local standards. The Development Services Department’s Planning and Zoning Division can help guide Live Local Act proposals through the Development Order review process.

Link to this answer: What is the Live Local Act and what does it allow?

What is the Technical Review Committee (TRC) and what is its role?

The TRC is a multi-disciplinary team comprised of City staff from various City departments and division assigned by the City Manager or their designee, tasked with reviewing development applications in Panama City, Florida. It’s primary role is to ensure that all proposed developments and development related activities comply with the applicable local Code of Ordinances, Unified Land Development Code (ULDC) and the City’s Comprehensive Plan. The Development Services Director chairs the Technical Review Committee.

Link to this answer: What is the Technical Review Committee (TRC) and what is its role?

What is your plan review and application process timeframe?

Although a defined timeframe cannot be provided, we aim to begin permit reviews no later than 24 business hours after submission. The completion of the permit review will vary and will depend on the type and complexity of the permit application.

Per Florida Building Code Eighth Edition (2023), Section 105.3.1: The building official shall examine or cause to be examined applications for permits and amendments thereto within a reasonable time after filing.

Link to this answer: What is your plan review and application process timeframe?

What kind of work requires a building permit?

Per the Florida Building Code Section 105.1: “ Any owner or owner’s authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any impact-resistant coverings, electrical, gas, mechanical or plumbing system, the installation of which is regulated by this code, or to cause any such work to be performed, shall first make application to the building official and obtain the required permit.”

Link to this answer: What kind of work requires a building permit?

What Projects are exempt from needing a permit?

In accordance with the Current edition of The Florida Building Code, the following items are exempt from permitting:

Floor coverings such as tile or carpet

Minor cabinetry which does not include any electrical or plumbing fixtures

Minor drywall repairs

Painting

Portable Heating or cooling appliances

Other minor home repairs as deemed exempt by the Building Official.

Link to this answer: What Projects are exempt from needing a permit?

What should be submitted to obtain a Development Order (D.O.)?

Depending on the extent of the project, required documents can include site plans, surveys, architectural plans, civil plans, landscape plans and stormwater plans. Incomplete packages will not be accepted for review. However, your contact person/project manager will be contacted if additional information is required by staff. All additional information must be submitted before the City issues an approved D.O.

Link to this answer: What should be submitted to obtain a Development Order (D.O.)?

What should be submitted to obtain a Development Order?

Depending on the type and extent of the project, required documents can include site plans, surveys, architectural plans, civil plans, landscape plans and stormwater plans. Incomplete packages will not be accepted for review. However, your contact person/project manager will be contacted if additional information is required by staff. All additional information must be submitted before the City issues an approved Development Order. The Applicant’s Development Guide is located on the Development Services Department’s Planning and Zoning Division webpage. It provides overviews and checklists for various Development Order submittal types. All applicants should consult the applicable regulations in the Unified Land Development Code (ULDC) and the local Comprehensive Plan to review all the adopted policies and development requirements.

Link to this answer: What should be submitted to obtain a Development Order?

What type of activity requires a Development Order (D.O.)?

Most activity, such as accessory structures, additions, lot clearing, new construction, renovations, signs, tree removal and other site improvements require a D.O. Check with us to determine if one is needed for your project before you begin your project.

Link to this answer: What type of activity requires a Development Order (D.O.)?

What type of work requires a permit?

Any of the following: windows, doors, foundation work, re-roof, structural work (removing/moving walls), siding, attached structures (porches, decks, awnings,) accessory structures, pole barn, sheds over 100sqf, shed deliveries over 100sqf, water heaters, electrical work, HVAC work, plumbing work. For a complete list you should contact the Building Services Division and discuss your scope of work with one of our permit techs.

Link to this answer: What type of work requires a permit?

When and why must I file a Notice of Commencement (NOC)?

According to Chapter 713 of the Florida State Statutes, any improvements to a property with a direct contract price greater than $5,000 ($15,000 for HVAC replacements) require a Notice of Commencement be filed with the Bay County Clerk of Court Office. This NOC must be posted on the job site before the first inspection.

Link to this answer: When and why must I file a Notice of Commencement (NOC)?

When are fees collected for Development Orders and building permits?

Planning and Zoning fees must be paid prior to the application review. Building Services fees are paid at the time the permit is issued.

Link to this answer: When are fees collected for Development Orders and building permits?

When do I pay the review fee?

Planning and Zoning fees must be paid prior to the application review. Building Services fees are paid at the time the permit is issued.

Link to this answer: When do I pay the review fee?

When is a building permit required?

The Florida Building Code requires a Building Permit to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert, or replace any impact-resistant coverings, electrical, gas, mechanical or plumbing system, the installation of which is regulated by The Florida Building Code, latest edition.

Some examples are:

The moving, removal, or addition of any non-structural walls in both residential and commercial

Accessory storage buildings, regardless of size

Water Heater Replacements

Extension or installation of any electrical branch circuit or feeder

Ductwork extensions

Building permits would not be required for items that are being repaired such as a broken fence rail, replacement of appliances (other than water heaters), painting your residence, or for the replacement or addition of any type of non-structural flooring. Always call 850-872-3025 prior to the commencement of any construction project to verify whether a permit is required.

Link to this answer: When is a building permit required?

Where can I find the Florida Building Codes?

Link to this answer: Where can I find the Florida Building Codes?

Where do I find product approval codes?

Link to this answer: Where do I find product approval codes?

Where do I get an address from?

Street addresses are assigned by the City as part of the development and permitting process. Addressing ensures proper identification for emergency services, utilities, and mail delivery and is typically coordinated through the Development Services Department’s Planning and Zoning Division.

Link to this answer: Where do I get an address from?

Who can I contact if I have questions about planning or zoning regulations?

You can contact the City of Panama City Development Services Department’s Planning and Zoning Division by phone at 850-872-3025, via email at planning@panamacity.gov. If you would like to connect with us in person we are located in Room 217 on the 2nd Floor at City Hall, 501 Harrison Avenue, Panama City, Florida. Staff are available to answer questions, review proposals, and assist with understanding City regulations.

Link to this answer: Who can I contact if I have questions about planning or zoning regulations?

Will my project require plans?

Engineered plans are required on all new commercial or residential construction including accessory dwelling units, additions, remodels for which the scope of work includes structural alterations, accessory structures and repair to code projects.

Link to this answer: Will my project require plans?