2 alerts
See all
  • Notice: Temporary Utility Billing Office Closure Details
  • Warning: DOH-Bay Issues Advisory for Red Tide at Panama City Marina Details

Permits, building and zoning

When is a building permit required?

The Florida Building Code requires a Building Permit to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert, or replace any impact-resistant coverings, electrical, gas, mechanical or plumbing system, the installation of which is regulated by The Florida Building Code, latest edition.

Some examples are:

The moving, removal, or addition of any non-structural walls in both residential and commercial

Accessory storage buildings, regardless of size

Water Heater Replacements

Extension or installation of any electrical branch circuit or feeder

Ductwork extensions

Building permits would not be required for items that are being repaired such as a broken fence rail, replacement of appliances (other than water heaters), painting your residence, or for the replacement or addition of any type of non-structural flooring. Always call 850-872-3025 prior to the commencement of any construction project to verify whether a permit is required.

Still have a question? Call Development Services (Planning, Building, Code) at (850) 872-3025.

All questions