Chestnut Parking LotThe City is advancing the Chestnut Parking Lot improvement project in the St.
The City is advancing the Chestnut Parking Lot improvement project in the St. Andrews area to address the growing demand for accessible public parking as the community continues to thrive. Located at 1128 Chestnut Avenue, the project’s preferred design includes 113 parking spaces to improve capacity, access, and overall functionality for residents and visitors. The City is also coordinating with FPL to remove an existing pole on the western side of the property, allowing for a cleaner layout, better traffic flow, and safer navigation. The project is expected to go out to bid in late Spring 2026, marking a key step toward construction as the City continues enhancing local infrastructure and convenience.
- Location: 1128 Chestnut Ave
- Estimated Start Date: Summer 2026
- Estimated Completion Date: Winter 2026
- Funding Source: CDBG-DR Grant
- Estimated Cost: $336,545
Latest Update - October 2026: The Chestnut Parking Lot project is being completed in two phases, covering the east and west sides. On the east side, mulch has been installed, with paving anticipated to begin in early November. Work on the west side, located behind Hunt’s, remains ongoing as the City coordinates with Florida Power & Light (FPL) to facilitate the installation of underground electrical utilities.
St. Andrews Boardwalk RepairsThe St. Andrews Bayview Boardwalk needs repairs, and funding is available through a…
The St. Andrews Bayview Boardwalk needs repairs, and funding is available through a Rebuild Florida Hometown Revitalization grant and the CRA budget. The project aims to restore and expand the existing wooden boardwalk over the bay to help attract new business and activity to the area.
The City held a public meeting on May 7, 2026, regarding the St. Andrews Boardwalk Project. During the meeting, it was discussed that the existing boardwalk is in need of repair, and a proposed new 20-foot-wide boardwalk concept was presented for consideration. The main takeaway from the meeting was the public preference for adding 20-foot by 20-foot covered areas on both sides of the boat ramp, rather than placing a covered area on only one side of the ramp.
At this time, the project is proposed to be 100% funded through the CRA; however, there are still many details to be worked out regarding overall project costs and final design considerations.
Rails with TrailsRails with Trails Infographic
Parking Lots at 6Th St. & Harrison AveThe purpose of the project was to increase public parking availability and improve…
The purpose of the project was to increase public parking availability and improve parking efficiency in Downtown Panama City by refurbishing multiple parking lots near 6th Street and Harrison Avenue. The project also establishes 24/7 public access through a partnership with First Baptist Church and shared use across four parking lots.
The project included resurfacing, restriping, and redesigning parking space layouts to maximize parking capacity and improve traffic flow. Work is being completed on parking lots located at the southeast corner of 6th Street & Grace Avenue and the southwest and southeast corner lots of 6th Street & Harrison Avenue.
The project improved accessibility and convenience for residents, visitors, and downtown businesses by increasing the availability and efficiency of public parking. Enhanced parking infrastructure supports economic activity in the downtown area, improves traffic circulation, and provides reliable 24/7 parking access for the community.
- Estimated Start Date: January 2026
- Estimated Completion Date: March 2026
- Funding Source: The project is primarily funded through the Hometown Revitalization Grant in the amount of $369,095. The remaining balance is being split equally between the City of Panama City and First Baptist Church, with each contributing $33,122.94.
- Estimated Cost: $435,340.88
This project is complete.