PCFD 2021 Annual Report
This is the text of the document, page by page, so it is easy to read on any screen or with a screen reader. Tables and pictures are only in the original.
Download an accessible PDF of this text (tagged for screen readers)
Page 14
Panama City Fire Department Panama City, FL This report was generated on 1/6/2022 11 :11 :04 AM • Completed Inspections by Zone by Inspection Type by Inspection Result for Date Range Start Date: 01/01/2021 I End Date: 12/31/2021 ZONE: No Zone INSPECTION TYPE General Fire Safety Inspection TOTAL ZONE: Panama City Limits INSPECTION TYPE - - 1st Reinspection 2nd Reinspection 3rd Reinspection 4th Reinspection ---- - 5th Reinspection 6th Reinspection Annual Complaint Fire Protection System Inspection - - General Fire Safety Inspection Hazardous Use Permit COMPLETED INSPECTIONS 26 26 COMPLETED INSPECTIONS 329 48 9 2 1 1 3 1 4 2494 2 - ___ _,__ ____ Occupancy Check - - Plan Review --------- Pre-PIan Special TOTAL GRAND TOTAL _] 25 1 41 9 -- 2970 2996 -- -� NO VIOLATIONS NOTED COMSHORT 1 ISSUED COMSHORT FINAL ISSUED -- - -- 26 0 0 26 0 0 NO VIOLATIONS NOTED 329 48 9 2 1 1 3 1 4 2494 2 25 1 41 9 2970 2996 COMSHORT 1 ISSUED COMSHORT FINAL ISSUED E-- 0 0 0 0 I I I T L 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o __ I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Only Completed Inspections appear in the results. This is a Custom Report, so results will vary for Users not from that Department. -� emergencyreporting.com Doc Id: 1751 Page# 1 of 1
