PCFD 2022 Annual Report
This is the text of the document, page by page, so it is easy to read on any screen or with a screen reader. Tables and pictures are only in the original.
Download an accessible PDF of this text (tagged for screen readers)
Page 14
fanama City Fire Department Panama City. FL I This report was generated on 5/20/2025 11:28:13 AM Completed Inspections by Zone by Inspection Type by Inspection Result for Date Range Start Date: 01/01/2022 I End Date: 12/31/2022 ZONE: Panama City Limits INSPECTION TYPE 1st Reinspection 2nd Reinspection 3rd Reinspection Complaint Fire Protection System Inspection General Fire Safety Inspection Plan Review Pre-Plan Special ,---- Station Inspection TOTAL ZONE: Panama City North Limits INSPECTION TYPE 1st Reinspection General Fire Safety Inspection TOTAL GRAND TOTAL ] COMPLETED INSPECTIONS 275 50 10 3 10 2484 1 3 20 13 2869 COMPLETED INSPECTIONS - 1 ===f 2 3 2872 NO VIOLATIONS NOTED 275 50 10 3 10 2484 1 3 20 13 2869 NO VIOLATIONS 1 2 3 2872 -- f I COMSHORT 1 ISSUED 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Only Completed Inspections appear in the results. This is a Custom Report, so results will vary for Users not from that Department. -- j - l 91 COMSHORT FINAL ISSUED 0 0 0 0 0 0 0 0 0 0 0 COMSHORT FINAL ISSUED 0 0 0 0 ----j I I I ! I J ENERGENCY REPORTING" emergencyreporting.com Doc Id: 1751 Page# 1 of 1
