PCFD 2023 Annual Report
This is the text of the document, page by page, so it is easy to read on any screen or with a screen reader. Tables and pictures are only in the original.
Download an accessible PDF of this text (tagged for screen readers)
Page 14
Panama City Fire Department Panama City. FL This report was generated on 5/20/2025 11 :51 :47 AM Completed Inspections by Zone by Inspection Type by Inspection Result for Date Range Start Date: 01/01/20231 End Date: 12/31/2023 ZONE: No Zone INSPECTION TYPE Special TOTAL ZONE: Panama City Limits INSPECTION TYPE - 1st Reinspection 2nd Reinspection 3rd Reinspection r--- 4th Reinspection I- 5th Reinspection Complaint Fire Protection System lnspe General Fire Safety Inspect Special Special Hazard Station Inspection TOTAL ::tion ion ZONE: Panama City North Limits INSPECTION TYPE I -- - General Fire Safety Inspection TOTAL I GRAND TOTAL I -- COMPLETED INSPECTIONS 1 1 COMPLETED INSPECTIONS 131 39 15 4 1 1 13 2589 17 3 8 2821 COMPLETED INSPECTIONS r ==f 4 4 2826 I -- NO VIOLATIONS NOTED 1 1 NO VIOLATIONS NOTED 131 39 15 4 1 1 13 2589 17 3 8 2821 NO VIOLATION 4 2826 �� I COMSHORT 1 ISSUED 0 0 COMSHORT 1 ISSUED 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Only Completed Inspections appear in the results. This is a Custom Report, so results will vary for Users not from that Department. --- f COMSHORT FINAL ISSUED 0 0 COMSHORT FINAL ISSUED 0 0 0 0 0 0 0 0 0 0 0 0 COMSHORT FINAL ISSUED 0 0 0 emergencyreporting.com Doc Id: 1751 Page# 1 of 1 I ' ' I - -
