Completed Projects

Downtown Wayfinding SignageProject OverviewThis project aims to create a cohesive streetscape that enhances the…
Downtown Wayfinding Signage Project

Project Overview

This project aims to create a cohesive streetscape that enhances the area’s identity and appeal. Collaborating with the Downtown Improvement Board and Destination Panama City, the CRA conducted a design and location analysis. Inspired by the historic Martin Theater, the in-house design utilizes the theater's renovation as a focal point and incorporates black signage and poles to complement existing black benches, trash cans, and fountains for a unified look. Additionally, four directory boards matching the Martin Theater design will be installed to improve wayfinding and the visitor experience.

Project Features

  • New street name signage
  • New wayfinding signage
  • New directory boards

Project Details

  • CRA District: Downtown District
  • Project Cost: $125,000
  • CRA Contribution: $115,000
  • CRA Funding Source: FY2025 Downtown District Budgets

Project Dates

  • Adjustments to sign heights: September 2025
  • Installation of additional requested signage: June 2025
  • Installation of signage: January - March 2025
  • Fabrication: September - November 2024
  • Material Procurement: September 2024
  • Design Creation: June - August 2024
  • Site Assessment & Planning: May 2024

Before and After Photos:

Downtown Wayfinding Signs

CRA Project Manager: Michelle Zirkle

Redevelopment plan

Downtown Redevelopment Plan

McKenzie park restroomsCRA Project Manager: Michelle ZirkleProject OverviewIn a collaborative effort, the…

CRA Project Manager: Michelle Zirkle

McKenzie Park Restrooms

Project Overview

In a collaborative effort, the Panama City Community Redevelopment Agency (CRA) and the Downtown Improvement Board (DIB) are partnering to bring public restrooms to McKenzie Park. This initiative aims to address a community need by providing convenient and accessible restroom facilities for park visitors, enhancing the overall park experience and contributing to the revitalization of the downtown district.

Project Features

  • Four total gender-neutral restroom stalls
  • Two ADA compliant stalls
  • Ramp Access
  • Handrails for support
  • Baby changing stations

Project Details

  • CRA District: Downtown District
  • Project Budget: $265,000
  • CRA Contribution: $165,000
  • CRA Funding Source: FY2024 Downtown District Budget
  • DIB Contribution: $100,000

Project Dates

  • Construction commenced June 24, 2024.
  • Project is anticipated to be complete by early January 2025.

Past Events

  • January 2025 - Project Complete
  • June 24, 2024 – Construction begins
  • June 2024 – Revisions to engineering plans finalized.
  • May 21, 2024 – CRA Board approved the award of the lowest bid to Inland Construction & Engineering Inc.
  • May 15, 2024 – Project bidding was opened. Two bids were received.
  • March 12, 2024 – MOU executed between the City of Panama City, CRA and the DIB
  • March 11, 2024 – Development Order issued.
  • February 14, 2024 – Final Engineering plans received.

CRA Project Manager: Michelle Zirkle

Redevelopment Plan

Downtown Redevelopment Plan

Mckenzie park improvementsProject OverviewNestled in the heart of historic downtown Panama City, McKenzie Park…
McKenzie Park Improvements Project

Project Overview

Nestled in the heart of historic downtown Panama City, McKenzie Park has long been cherished as a serene gathering place for residents and visitors alike. The City of Panama City is excited to announce a series of thoughtful updates and planned enhancements aimed at revitalizing this beloved park and creating an even more inviting space for the community to enjoy.

Project Features

  • New benches
  • New trash cans
  • Chess tables
  • Drinking fountain
  • Pet waste station
  • Pergola swings

Project Details

  • CRA District: Downtown District
  • Project Cost: $40,000 (excludes restroom)
  • CRA Funding Source: FY2024 & FY2025 Downtown District Budgets

Project Dates

  • Updates commenced June 2024
  • Project completion is June 2025
  • Restroom completion is scheduled for December 2024

CRA Project Manager: Michelle Zirkle

Redevelopment plan

Downtown Redevelopment Plan

Luverne Ave Dumpster EnclosureProject OverviewThe CRA is undertaking a project to consolidate three dumpsters that…

Project Overview

The CRA is undertaking a project to consolidate three dumpsters that are currently located along Luverne Avenue, between 4th and 5th Streets in the Downtown district. This initiative aims to enhance the overall cleanliness and traffic flow of the area. Additionally, it will free up valuable parking spaces behind businesses that have rear entrances. With the consent and approval of the Downtown Improvement Board (DIB), two larger dumpsters will be centrally located on a parcel owned by the DIB. To improve the visual appeal of the area, an enclosure will be constructed around the dumpsters.

Project Features

  • Two 24-ft dumpsters
  • Durable enclosure with gate

Project Details

  • CRA District: Downtown District
  • Project Cost: $4,000
  • CRA Contribution: $4,000
  • CRA Funding Source: FY2025 Downtown District Budget

Project Dates

  • Project concept approved December 12, 2024
  • Project is anticipated to be complete by February 1, 2025

CRA Project Manager: Lena Webb

Redevelopment Plan

Downtown Redevelopment Plan

Park Ave CrosswalkProject OverviewThe project involved the creation of a crosswalk across Park Avenue…
McKenzie Park Crosswalk Project

Project Overview

The project involved the creation of a crosswalk across Park Avenue, connecting Gateway Park to McKenzie Park. The primary objective of this initiative was to enhance pedestrian flow, increase visibility, and create a more inviting and grand entrance to McKenzie Park. By expanding the crosswalk, the project aimed to improve safety for pedestrians, while also providing better access to McKenzie Park’s recreational and natural spaces.

Project Features

  • Elimination of 5 parking spaces
  • Restriping for crosswalk

Project Details

  • CRA District: Downtown District
  • Project Cost: $3,175.00
  • CRA Contribution: $3,175.00
  • CRA Funding Source: FY2024 Downtown District Budget

Project Dates

  • Construction completed May 17, 2024.

CRA Project Manager: Lena Webb

Before & After Photos

Redevelopment plan

Downtown Redevelopment Plan

Breezeway

Project OverviewThe primary objective of this project is to establish a pedestrian walk-through access…
Downtown Breezeway Project

The primary objective of this project is to establish a pedestrian walk-through access point midway down the 400 Block of Harrison Avenue, creating a direct and convenient connection between public parking on Grace Avenue and the shops and restaurants along Harrison Avenue. This walk-through aims to improve accessibility and support increased foot traffic to downtown businesses. The initial phase of the project has focused on creating this access point, with the remaining portion of the property positioned for future commercial development. The City is actively seeking a developer to transform the remaining space into a vibrant commercial use that complements the surrounding district and supports continued economic growth.

Project FeaturesPhase 1Phase 2 - Secure a Developer to Provide: Land swap to acquire propertyTemporary…
  • Phase 1
  • Phase 2 - Secure a Developer to Provide:
  • Land swap to acquire property
  • Temporary pedestrian path connecting Harrison Avenue and the Grace Avenue parking lot
  • Exterior improvements, including façade enhancements and murals to complement the downtown aesthetic
  • Improved rear entrance to enhance safety, including new handrails on stairs
  • Public restrooms
  • Repositioning of pedestrian path to maximize interior space
  • Structural and electrical upgrades
  • Interior design overhaul to create flexible commercial space
  • Structural repairs and upgrades
Project DetailsCRA District: Downtown DistrictProject Cost: $500.000CRA Contribution: $100,000CRA…
  • CRA District: Downtown District
  • Project Cost: $500.000
  • CRA Contribution: $100,000
  • CRA Funding Source: FY23, FY24 and FY25 Downtown District Budgets
Project Design Plans and Concepts:Coming Soon
  • Coming Soon
Project DatesConstruction of walk-thru completed June 2023
  • Construction of walk-thru completed June 2023
Past EventsOctober 10, 2023 – Temporary pedestrian path open to the publicJanuary 2024 – Interior…
  • October 10, 2023 – Temporary pedestrian path open to the public
  • January 2024 – Interior mural completed by Beau Bradbury
  • January 2024 - Front mural completed by Morgan Summers
  • January 24, 2024 – Task Order signed with FL Architects for plans and cost estimates for Phase 2
  • February 21, 2024 – Rear murals completed by Fast Signs
  • January 2025 - Plans and cost estimates provided by FL Architects
  • March 2025 - Issued RFP for development opportunities

Project Manager: Lena Webb

Henry A. Davis ParkProject OverviewThe transformation of Henry Davis Park is a long-awaited project rooted…

Project Overview

Henry Davis Park Renovation

The transformation of Henry Davis Park is a long-awaited project rooted in the voices of the Glenwood community. Identified as a top priority during the 2025 CRA Socials and online community survey, the park’s revitalization reflects a shared vision for more accessible, inclusive, and engaging public spaces.

Set for completion by April 2026, the reimagined Henry Davis Park will be a vibrant neighborhood destination designed to strengthen community bonds and support healthy and active lifestyles.

Project Features

  • 20x30 Pavilion with picnic tables, XL grill and hot coals disposal bin
  • 20x20 shade canopy for community garden with workstation table
  • 6x10 shed and gardening supplies for community garden
  • Kiwanis Centennial Playground
  • Bankshot Basketball Court
  • Gaga Ball Pit
  • Repaint Restrooms
  • Bike rack and bike repair station with air pump
  • Repaint remaining swingset and replace swings
  • Park Sign
  • Henry A. Davis Memorial Sign
  • New fencing

Project Details

  • CRA District: Downtown North District
  • Project Cost: $300,000
  • CRA Contribution: $125,000
  • CRA Funding Source: FY2025 Downtown North District Budget
  • Kiwanis Contribution: $175,000

Project Design Plans and Concepts: /DocumentCenter/View/10223

Project Dates

  • Design phase began March 2025.
  • Construction began July 2025.
  • Construction completed March 2026.
  • Ribbon Cutting Celebration April 25, 2026

CRA Project Manager: Michelle Zirkle

Completed Project Photos

Henry Davis Park Gaga Ball Pit
Mlk Blvd BeautificationProject OverviewThe Martin Luther King Jr.

Project Overview

The Martin Luther King Jr. Blvd (SR77) Median Beautification project was a landscaping and beautification initiative aimed at enhancing the medians along Martin Luther King Jr. Blvd. This project included the installation of Florida-friendly plants and landscaping, improving the visual appeal and environmental sustainability of this key corridor.

Funded through a $300,000 grant from the Florida Department of Transportation (FDOT), this project was a collaborative effort to enhance the streetscape and create a more welcoming roadway for residents and visitors.

Project Features

  • Florida-friendly landscaping along the medians of Martin Luther King Jr. Blvd (SR77)
  • Improved aesthetics and environmental sustainability
  • Enhanced streetscape for a more attractive and inviting corridor

Project Details

  • CRA District: Downtown North CRA District
  • Project Cost: $310,000
  • FDOT Grant Contribution: $300,000
  • CRA Contribution: $10,000
  • Project Completion: December 2024

CRA Project Manager: Michelle Zirkle

Redevelopment Plan

Downtown-North-Plan-PDF (panamacity.gov)

World Changers 2024
CRA E 9th Court Project Banner (1)
Project OverviewThe Panama City Community Redevelopment Agency, Downtown North District started an…

The Panama City Community Redevelopment Agency, Downtown North District started an initiative to revitalize a three-square block area in the Glenwood community. In a collaborative effort with several community organizations, this initiative aims to address housing repairs and community resource outreach.

Project FeaturesWorld Changers provided labor for repairs to 15 homes.Public Works provided two 22-yard…
  • World Changers provided labor for repairs to 15 homes.
  • Public Works provided two 22-yard dumpsters for solid waste disposal.
  • Parks, Culture and Recreation helped by mowing and clearing city-owned lots.
  • Code Enforcement handed out flyers.
  • Panama City Police Department provided the CORE trailer for neighborhood kids, snow cones, and provided information to the community about starting a neighborhood watch program.
  • Bay County Health Department provided free medical screenings and resources information.
  • Rebuild Bay provided resource information and took applications for those that did not apply for the World Changers program to provide help through their community clean up committee. They also provided air conditioning units through their Keep It Cool program and coordinated with World Changers to provide additional tools needed through the Tool Bank.
  • Legal Services of North Florida was available to discuss probate issues.
Project DetailsCRA District: Downtown North DistrictProject Cost: $50,000CRA Contribution: $50,000CRA…
  • CRA District: Downtown North District
  • Project Cost: $50,000
  • CRA Contribution: $50,000
  • CRA Funding Source: FY2024 Downtown North District Budget
Project DatesCommenced July 8, 2024.Project completed: November 2024.
  • Commenced July 8, 2024.
  • Project completed: November 2024.
Past EventsMay 16, 2024 – Community MeetingMay 16 – June 21, 2024 – Applications for World…
  • May 16, 2024 – Community Meeting
  • May 16 – June 21, 2024 – Applications for World Changers accepted
  • July 16, 2024 – RFP PC24-041 – 9th Ct Commercial Property was published
  • August 16, 2024 – RFP PC24-041 bid open – none received
  • August 13, 2024 – City of Panama City Commission approved motion to sell the former police substation located at 920 MLK Blvd for new commercial development.

CRA Program Manager: Lena Webb

Redevelopment PlanDowntown-North-Plan-PDF (panamacity.gov)

More details

Historic Millville Cemetery RehabillitationProject OverviewOn October 25, 2025, volunteers came together to improve Historic…
CRA Millville Cemetery Volunteer Day Flyer

Project Overview

On October 25, 2025, volunteers came together to improve Historic Millville Cemetery, a six-acre site that holds generations of the community’s history. Volunteers painted the perimeter fence, with site preparation provided by the City’s Parks, Culture & Recreation Department and paint, supplies, and refreshments funded by the Millville CRA.

The effort was made possible through partnerships with Hiland Park Baptist Church, ForBay, NorthStar Church, Emmanuel Baptist Church and Carlisle Baptist Church.

Project Features

  • Painted the perimeter fence surrounding the six-acre cemetery.
  • Power washed the fence and cemetery sign.
  • Cleared overgrown plants and debris along the fence line.
  • Provided paint, supplies, refreshments, and snacks for volunteers.

Project Details

  • CRA District: Millville District
  • Project Cost: $30,000
  • CRA Funding Source: FY26 Millville District Budget

Project Dates

  • Completed: October 25, 2025

Redevelopment Plan: Millville CRA Redevelopment Plan

CRA Project Manager: Michelle Zirkle

Millville US98 FDOT BeautificationProject OverviewThe Millville US98 FDOT Beautification project is a landscaping and…
Millville Gateway Beautification Project

Project Overview

The Millville US98 FDOT Beautification project is a landscaping and beautification initiative focused on enhancing the gateway entrance to the Millville District, near Whittington Park. This effort aims to plant Florida-friendly vegetation along both sides of US98, creating a welcoming and aesthetically pleasing corridor for residents and visitors.

This project is a collaboration between the Florida Department of Transportation (FDOT) and the Millville CRA District, showcasing a commitment to sustainable and visually appealing community development.

Project Features

  • Florida-friendly landscaping along both sides of US98
  • Gateway beautification to highlight the Millville District
  • Sustainable plantings for improved aesthetics and environmental impact

Project Details

  • CRA District: Millville District
  • Project Cost: $260,000
  • CRA Contribution: $10,000
  • FDOT Grant Contribution: $250,000
  • CRA Funding Source: FY25 Millville District Budget

Project Dates

  • July 2024: Piney Grove Nursery awarded the contract through RFP solicitation
  • Completed: June 2025

CRA Project Manager: Michelle Zirkle

Redevelopment Plan: Millville CRA Redevelopment Plan

Millville Gateway SignProject OverviewThe goal of this project is to renovate the existing gateway sign on US…
Millville Gateway Sign Project

Project Overview

The goal of this project is to renovate the existing gateway sign on US Hwy 98 at the entrance to the Millville district. Over time, the sign has weathered and required numerous repairs to its lettering. In 2022, a new design was created with input from the Millville Advisory Board. However, the project was delayed due to cost and permitting challenges, as well as the prioritization of other projects in the district. The project, along with its original design, is currently under evaluation, with plans to complete it in FY2025.

Project Features

  • Modern, double-sided monument sign
  • Raised and painted stucco lettering

Project Details

  • CRA District: Millville District
  • CRA Contribution: $20,000
  • CRA Funding Source: FY2025 Millville District Budget

Project Design Plans and Concepts:

Z:\Districts\180 - Millville\Projects\Millville gateway sign\Job Detail Panama City-Millville Monument-v3.pdf

Project Dates

  • Project completed September 2025.

CRA Project Manager: Lena Webb

After Photos

Millville Gateway Sign

Redevelopment Plan

Millville Redevelopment Plan

Villa Gateway Park SignProject OverviewVilla Gateway Park is a treasured public space on the waterfront and a…
Villa Gateway Park Sign

Project Overview

Villa Gateway Park is a treasured public space on the waterfront and a valuable community asset in St. Andrews, offering residents and visitors a place to enjoy the district’s scenic shoreline.

Completed in July 2026, this project replaced the park’s sign damaged by Hurricane Michael, restoring a welcoming landmark that reflects St. Andrews’ character and highlights this waterfront destination.

Project Details

  • CRA District: St. Andrews District
  • Project Cost: $3,700
  • CRA Funding Source: FY2026 St. Andrews District Budget

CRA Project Manager: Michelle Zirkle

Bayview Ave Drinking FountainProject OverviewVilla Gateway Park’s waterfront setting makes it a special place to…
Villa Gateway Park Fountain

Project Overview

Villa Gateway Park’s waterfront setting makes it a special place to spend time outdoors in St. Andrews. A new drinking fountain and pet station installed along Bayview Avenue adds everyday convenience for residents and visitors enjoying the park with their pets.

Completed in July 2026, this improvement supports a more welcoming and comfortable experience at a valued community gathering place.

Project Features

  • New drinking fountain and pet station along Bayview Avenue at Villa Gateway Park.

Project Details

  • CRA District: St. Andrews District
  • Project Budget: $5,000
  • CRA Funding Source: FY26 St. Andrews District Budget

Project Dates

  • Completed: July 2026

CRA Project Manager: Michelle Zirkle

St. Andrews Gateway SignProject OverviewThis project aims to enhance the existing gateway sign at the East and…
St-Andrews-Sign-at-US-98

Project Overview

This project aims to enhance the existing gateway sign at the East and West entrances to St. Andrews by adding an additional panel. The new panel will be designed to complement the existing sign and feature the message, "Thank You for Visiting St. Andrews," reinforcing the community’s welcoming atmosphere for visitors. This expansion will not only improve the visibility and aesthetic appeal of the gateway but also leave a lasting, positive impression as visitors depart, promoting St. Andrews as a charming and vibrant destination. The project reflects the city's commitment to enhancing its entrances and creating a more inviting environment for both residents and tourists.

Project Features

  • Additional side to complete the triangle shaped signage
  • Same award-winning design applied to the additional side

Project Details

  • CRA District: St Andrews District
  • Project Cost: $8,375.00
  • CRA Contribution: $8,375.00
  • CRA Funding Source: FY2024 St Andrews District Budget

Project Design Plans and Concepts:

Project Dates

  • Project completed September 2024

CRA Project Manager: Lena Webb

Redevelopment Plan

St Andrews Redevelopment Plan

11th Court SidewalksProject OverviewCompleted in June 2026, the 11th Court Sidewalk Improvements project…

Project Overview

Completed in June 2026, the 11th Court Sidewalk Improvements project created a pedestrian connection from the new Chestnut Avenue public parking lot to Beck Avenue, St. Andrews’ main business district, and the waterfront.

The new sidewalk and curb along the south side of 11th Court make it easier for residents and visitors to park and explore the district’s shops, restaurants, parks and waterfront on foot.

Project Features

  • New sidewalk along the south side of 11th Court between Beck Avenue and Chestnut Avenue
  • New curb along the added section of sidewalk
  • New curb-o-let to improve drainage issues

Project Details

  • CRA District: St. Andrews District
  • Project Budget: $36,400
  • CRA Funding Source: FY26 St. Andrews District Budget

Project Dates

  • Completed: July 2026

CRA Project Manager: Michelle Zirkle

Redevelopment Plan: St. Andrews CRA Redevelopment Plan